Project

Home > Projects > Power Plant

DatangFuzhou Power Plant


The total installed capacity of the power plant is currently Phase I 2? 1000MW Ultra Supercritical Steam Turbine Generator Unit, Phase II Plan 2? The 1000MW ultra-supercritical unit will be equipped with high-efficiency electrostatic precipitator. Phase I Unit 1 is expected to be put into operation in December 2015 and Unit 2 is expected to be put into operation in February 2016. After the two units are put into operation, the annual equipment utilization hours are about 5,000 hours, generating about 800,000 tons of fly ash, 90,000 tons of slag and 21,300 tons of pebble coal each year.


Get Started

Fill out the form below or call for information andpricing

Our Wrenches

We supply tools for all grade and size high strength bolt fastening,TC shear wrench,Electric torque control wrench,impact wrench.Our stable working wrenches make bolt fasten easier,Better Wrench,Better Better service.

About Us

We dedicated to supply better tools for high strength bolt fasten,with many years of production experience,SG shear wrench become the most professional shear wrench manufacture in China.

 

Your cookie settings.

Personalised experiences at full control.

This website uses cookies and similar technologies (“cookies”). Subject to your consent, will use analytical cookies to track which content interests you, and marketing cookies to display interest-based advertising. We use third-party providers for these measures, who may also use the data for their own purposes. 

You give your consent by clicking "Accept all" or by applying your individual settings. Your data may then also be processed in third countries outside the EU, such as the US, which do not have a corresponding level of data protection and where, in particular, access by local authorities may not be effectively prevented. You can revoke your consent with immediate effect at any time. If you click on "Reject all", only strictly necessary cookies will be used.